Skip to content
Engine RocksCoventry contract engineering supply
Contractors Mechanical, controls and site engineering

Straight work, straight contact

If You Build, Draw, Wire, Fault-Find Or Commission, We Will Be Straight With You.

Engine Rocks is intentionally narrow. Hannah Wilkes founded it in Coventry in 2023 after recruiting engineers for automation houses, tier-one suppliers and small machine builders across the West Midlands. That means fewer “might be relevant” calls and more proper conversations about real contract scopes.

Most client bookings are at least 4 weeks, normal timesheets run weekly, and the usual payment terms behind the booking are 14 days from invoice.

What to send

Make Yourself Easy To Place.

  • CV

    Keep the project detail in. Machinery, PLC family, CAD stack and site type matter more than slogans.

  • Location

    Where you start from, what you will travel to daily and when digs become part of the rate.

  • Rate

    Day rate or hourly rate, plus any shift, weekend or travel rules you will not bend.

  • IR35 preference

    Inside, outside or case-by-case, with enough honesty that nobody wastes a call.

  • Stack

    SolidWorks, Inventor, EPLAN, TIA Portal, Studio 5000, drives, HMI, robots or whatever you actually use.

  • Notice

    Earliest start date, current contract end date and any holiday already booked.

How CVs are handled

No Mystery Sending.

Your CV is sent with permission, not because someone wants to look busy on a Friday afternoon. Rates are agreed before introduction and not shaved after the client shows interest. Once an interview is confirmed, the client is named, the scope is repeated and any awkward gaps are put on the table.

Engine Rocks will not pretend a role is outside IR35 if the working practices say otherwise, and will not hide a poor shift pattern behind soft language. You can say no quickly. That is healthier than being talked into a bad start.

Contractor fit grid

Where You Fit Best.

Mechanical design

Draw It So It Can Be Made.

Fixtures, guarding, machinery mods, layouts, fabrication packs, design change and drawing control.

Controls software

Code With The Line In Mind.

Siemens, Rockwell, HMI, drives, diagnostics, software changes and production support.

Commissioning

Make The Snag List Useful.

Start-up, I/O checks, FAT, SAT, operator handover and calm problem sorting on customer sites.

Maintenance project cover

Help The Permanent Team Breathe.

Shutdown work, line moves, fault finding, minor projects and planned backlog support.

Technical documentation

Turn The Job Into A Handover.

Manuals, EPLAN, as-builts, risk assessment support, spares lists and controlled packs.

Small warning

Engine Rocks will not put contractors into vague scopes, unpaid trials, roles with poor safety arrangements, licence requirements the client has not checked, or umbrella-only assignments where the advertised take-home falls below lawful or decent market rates.

Email hello@enginerocks.com